Same-Day & Next-Day Delivery
Clean, Compactable Materials
Transparent Per-Load Pricing
Licensed & Insured
Dump Truck Services

Site Scraping, Erosion Control and Pipe Bedding Aggregates

O'Leary Development Group November 10, 2026

How to strip and grade a San Antonio site, control erosion, and choose and place pipe bedding gravel and sand, with Texas specs and delivery tips.

San Antonio’s Go-To Material Supplier
Get a Free Per-Load Quote Today
Same-day delivery available · Transparent pricing · Licensed & insured

Scrape the site, protect it from runoff, then bed the pipe in the right material. Do those three jobs in that order and your utility trench goes in cleaner, passes inspection sooner and stays put for decades. In San Antonio that means installing sediment controls before the first pass of the blade, hauling off stripped material promptly, and matching bedding to the pipe and the trench conditions. Crushed limestone, pea gravel, washed gravel and sand each have a place, and each has limits in local specs.

This guide walks through the sequence the way a crew lives it, with the Texas and San Antonio requirements that apply and the material choices that follow from them.

Olearydevelopmentgroup
olearydevelopmentgroup.com
Get Aggregates to Your Trench
O’Leary Development Group delivers bulk materials, including gravel, limestone and sand, to construction sites in San Antonio and surrounding cities.

Explore delivery services

Key Takeaways

  • Perimeter erosion controls go in before earth is disturbed. Texas’s construction general permit requires a stormwater pollution prevention plan before a notice of intent is filed.
  • Inspect controls at least every 14 calendar days and within 24 hours after a rain of 0.5 inches or more.
  • Bedding material depends on the pipe, the groundwater and the trench slope. Sand alone is restricted in water, wet trenches and steep grades under the SAWS spec.
  • Typical Texas municipal specs call for at least 6 inches of bedding, compacted to 95% Standard Proctor, with no voids under the pipe haunches.
  • Schedule hauling in layers of work: strip and haul off first, bring in bedding and backfill only when the trench is ready.

Table of Contents

What Site Scraping Actually Covers

Site scraping is the first pass of site preparation. The crew strips vegetation, roots and topsoil, cuts high spots and fills low ones to rough grade, and loads out whatever the job will not reuse. On a utility project it also sets the working surface for trenching equipment and defines where water will run once the ground is bare.

Three decisions made here affect everything that follows:

  1. Where the stripped material goes. Topsoil you want for finish landscaping can be stockpiled on site, away from drainage paths. Debris, concrete and unsuitable soil need to leave. Our dump truck haul-off service is priced at $275 per truck load for demolition and haul-off material.
  2. Where the water will go. Scraping removes the vegetation that slowed runoff. Plan swales, dikes and outlets before the ground is bare, not after the first storm.
  3. What the subgrade has to carry. Soft or wet spots found during scraping are cheaper to fix now than after pipe is laid. Our guide to site preparation, geotech and 95% compaction covers what to confirm before fill arrives.

If the ground is already mud, a stabilizing rock layer can restore access for trucks and trenching equipment. See our notes on rock for mud stabilization for sizes and haul specs.

Erosion and Sediment Control: What Goes In and When

Controls are not an afterthought to grading. The Texas Commission on Environmental Quality (TCEQ) 2023 Construction General Permit requires regulated site operators to prepare a stormwater pollution prevention plan (SWP3) before submitting their notice of intent. The permit lists structural controls that include silt fences, earthen dikes, drainage swales, sediment traps, check dams, storm drain inlet protection, rock outlet protection and sediment basins.

The order matters. A sensible sequence on a San Antonio utility job looks like this:

  • Before scraping: silt fence along downslope boundaries, a stabilized construction entrance, and protection on any storm drain inlets near the site.
  • During grading and trenching: diversion dikes or channels, check dams in concentrated flow paths, and rock at outlets where water leaves the disturbed area.
  • After final grade: vegetation, mulch or permanent stabilization, plus whatever rock armoring the drainage design calls for.

The City of San Antonio’s construction BMP guidance says that for grading, trenching and excavation, silt fencing should go around the site where required. It also calls for gravel bags or berms to protect nearby storm drain inlets, and periodic vacuuming or street sweeping of loose sediment on paved streets and sidewalks. It recommends avoiding excavation and grading in wet weather, and building diversion dikes or channels that send runoff to grass or roughened pavement to slow it. Once work is done, it suggests temporary or permanent vegetation to cover exposed soil.

Matching the control to the job

Control Where it works Material that supports it
Silt fence Downslope boundaries of the disturbed area Mostly fabric and posts; gravel bags help at low points
Stabilized entrance Where trucks leave the site Coarse crushed stone or rip rap
Inlet protection Storm drains near the site Gravel bags or berms
Rock outlet protection and check dams Concentrated flow and channel exits Rip rap, bull rock, drainage gravel
Final stabilization Bare slopes after grading Topsoil, mulch, vegetation

For rock-based controls we stock 3×5 rip rap bull rock drainage gravel and 2"-5" rip rap bull rock drainage gravel, plus boulders for heavier armoring. Your engineer’s plan sets the size and thickness.

Slopes, inspections and records

Slope drives risk. The TCEQ permit defines steep slopes as 15 percent or greater in grade where no other state, local or industry manual sets a different threshold. Those are the areas to stabilize first and watch most closely.

The permit sets the inspection rhythm too: at least once every 14 calendar days and within 24 hours after a storm of 0.5 inches or more. San Antonio storms can arrive fast, so keep clean stone and extra gravel bags available. A breached silt fence or a rutted entrance should be repaired the same day.

Silt fence protecting the foot of a graded slope

Ready to Order?
Call Now: 210-983-8005
Same-day delivery available on most orders in San Antonio and surrounding cities
Call Now

On larger public and highway work, inspection is a full-time role. People who do it, such as those filling lead highway inspector jobs, check that controls, grades and materials match the plans. Contractors who deliver documentation with each load make that process easier.

Permits in Bexar County

Who reviews your project depends on where it sits. Bexar County Public Works requires a Permit Verification Form. For projects inside the City of San Antonio’s extraterritorial jurisdiction, it also needs documentation that the city reviewed the proposed improvements, including a storm water detention determination. Confirm the current forms with the county and city before you mobilize.

Choosing Pipe Bedding Aggregates and Sands

Bedding is the material directly under and around the pipe. Its job is to give continuous, even support. TxDOT’s design manual says bedding should be select, compact material that conforms to the outside curve of the pipe. For rigid pipe, irregularities cannot be absorbed, so a poorly shaped bed can cause failure in critical shear zones. Flexible pipe tolerates minor imperfections because it can deform slightly.

TxDOT recognizes four bedding classes, A through D. Class C is the most economical and Class A the most expensive. For a given fill height, Class A lets you use the lowest reinforced concrete pipe strength, while Class C requires the greatest. Your engineer picks the class. Your supplier delivers the material that meets it.

Pipe bedding class cost and strength comparison

What the local specs allow

The City of Deer Park’s Specification 937 is a good example of a Texas municipal standard. It defines aggregate bedding as shell, crushed limestone, gravel, crushed gravel or crushed stone. Its rock aggregate gradation is 0% retained on the 1/2-inch sieve, 0 to 20% on the 3/8-inch, 65 to 100% on the No. 4 and 98 to 100% on the No. 10, with maximum wear of 35% under Tex-410-A. Aggregate bedding is used where plans show it or when ordered for unstable foundation conditions at pipe grade.

For San Antonio water and sewer work, the SAWS and New Braunfels spec book is the one to read. It includes several rules that decide material choice:

  • Crushed gravel or crushed stone is not allowed with polyethylene tubing or polyethylene film wrap.
  • Pea gravel or bedding stone is used in blasted trenches.
  • Sand alone is not allowed in watercourses, in trenches with groundwater, or in trenches with grades over 5 percent.
  • Pea gravel or bedding stone alone is not allowed in the street right-of-way within 5 feet of subgrade elevation in trenches 3 feet or wider.
  • Within the 100-year flood plain, sand is not permitted for backfilling.

Material quick guide

Condition Typically suitable Watch for
Dry trench, gentle grade, plastic or rigid pipe Screened sand or fine bedding stone, per the project spec Sand-only limits on steep or wet trenches
Groundwater or steep grade Pea gravel or bedding stone Spec limits near street subgrade
Blasted rock trench Pea gravel or bedding stone Keep sharp stone away from the pipe
Polyethylene tubing or wrap Sand or pea gravel as specified No crushed stone against the pipe
Unstable foundation at pipe grade Aggregate bedding such as crushed limestone Gradation and wear limits
Flood plain Non-sand bedding per spec Sand not permitted for backfill

This table reflects the specs above. Your plans and the governing utility’s current standard always control. We supply fill sand, pea gravel, washed gravel and crushed limestone aggregate. Send us the spec section or gradation requirement with your quote request so the load matches it.

Placing and Compacting Bedding

Good material still fails if it is placed badly. The pattern across Texas municipal specs is consistent.

  1. Cut the trench deep enough. Deer Park’s spec calls for excavating at least one inch below the bell on bell-and-spigot pipe, or three inches below the outside barrel on tongue-and-groove pipe. In no case is the cut less than six inches below the pipe flow line.
  2. Place and compact the bed. The same spec requires at least six inches of aggregate bedding to flow-line grade, compacted with mechanical tamps to at least 95% (plus or minus 2%) Standard Proctor Density.
  3. Haunch the pipe. After the pipe is set, place aggregate up to the spring line. Cavities between the spring line and trench bottom are prohibited.
  4. Keep lifts thin. Another Texas example, the City of Longview’s engineering specifications, grades the trench bottom 4 inches below the pipe and calls for at least 4 inches of compacted sand to the flow line before the pipe is laid. Always follow the number in your own project’s spec.
  5. Backfill in controlled lifts. Compaction technique for the material above the pipe zone is covered in our guide to compacting road base in 4 to 6 inch lifts.

For flex base used under roadways crossing the trench, see our TxDOT Item 247 flex base overview.

How Scraping, Drainage and Pipe Protection Fit Together

The same rainfall that erodes a bare slope can undermine a trench. Water running into an open trench carries sediment into your bedding, softens the foundation and can float or shift pipe. Practical habits that protect both:

  • Keep diversions above the trench so runoff goes around it.
  • Open only as much trench as the crew can bed and backfill that day.
  • Stage bedding stone and sand on the high side, covered if rain is forecast.
  • Stabilize spoil piles with fence or berms rather than leaving them at the trench edge.
  • Re-grade and re-vegetate as each section is finished instead of waiting for the end.

Our Perspective

We see the same pattern on San Antonio job sites: crews that treat scraping, erosion control and bedding as one sequence finish sooner and argue less with inspectors. The delays rarely come from the trench itself. They come from the wrong stone showing up, a load arriving before the trench is ready, or a silt fence washed out because rock for the outlet was not on site.

Schedule Delivery in Minutes
Get Your Free Quote Today
Tell us your location, access, and estimated yardage — we’ll handle the rest

That is why we think of delivery as part of the work plan, not an afterthought. We run dump truck hauling and bulk material delivery across Greater San Antonio, and our trucks are GPS-tracked, so we can plan loads around your sequence: haul-off first, rip rap and drainage rock for controls next, then bedding gravel, sand and fill as the trench opens. We offer same-day and next-day dispatch, and our per-load pricing is transparent.

Our advice is simple. Put the spec in the quote request, name the pipe type and conditions, and tell us where the truck can safely dump. We will match the material and the timing.

BRIAN

Getting Materials to Your Trench on Schedule

We haul and deliver the materials this kind of project uses: dump truck hauling, demolition and concrete haul-off, fill dirt, sand, pea gravel, washed gravel, crushed limestone, road base, rip rap and landscape rock. Contractors can set up accounts, and we offer net-30 invoicing. Request a quote through our services page, or start from the O’Leary Development Group home page to see the full product range.

2"-5" Rip Rap Bull Rock LC Drainage Gravel

Bring the pipe type, the spec section, the site address and your target delivery window. That is enough for an accurate quote.

FAQ

Can I use sand alone for pipe bedding in San Antonio?

Only where the governing spec allows it. The SAWS and New Braunfels spec book bars sand alone in watercourses, in trenches with groundwater and in trenches steeper than 5 percent. Sand is also not permitted for backfill in the 100-year flood plain. Check the utility standard for your project before ordering.

How thick should bedding be under the pipe?

It depends on the spec. Deer Park’s aggregate bedding spec requires at least six inches to flow-line grade, while Longview calls for at least four inches of compacted sand. Your project plans control, so use the number printed there.

How often must erosion controls be inspected in Texas?

Under the TCEQ 2023 Construction General Permit, inspections occur at least every 14 calendar days and within 24 hours after a storm of 0.5 inches or more. Make repairs promptly and keep your inspection records with your SWP3.

What size rock goes at outlets and check dams?

Your engineer’s drainage plan sets it. We carry rip rap bull rock in 2"-5" and 3×5 sizes, along with boulders. Send the plan sheet with your quote request so we can match the load to it.

Olearydevelopmentgroup
Discuss Your Project Materials
Contact O’Leary Development Group about material delivery or dump truck hauling for your construction, landscaping or industrial project.

Sources

Fill Dirt · Gravel · Road Base · Sand · Topsoil · Asphalt Millings
Need Materials Delivered in San Antonio?
Call O’Leary Development Group for a fast quote on fill dirt, gravel, road base, sand, topsoil, or asphalt millings delivered in San Antonio.